Quick Summary
Is this your chance to join the team constructing one of Scotland's largest offshore wind farms? Inch Cape Offshore Wind Farm Inch Cape is a 1080MW offshore wind farm situated 15km from the Angus coast in the North Sea.
Lead the execution delivery for Transport & Installation (T&I) campaign of export cables, including load-out, transport, cable laying, burial, pull-ins, and termination/testing.
Degree in Mechanical, Geotechnical, Civil or Structural Engineering. If you wish to make a big impact in renewables and being involved in this innovative project do not hesitate to apply.
Responsibilities
~1 min read- →Lead the execution delivery for Transport & Installation (T&I) campaign of export cables, including load-out, transport, cable laying, burial, pull-ins, and termination/testing.
- →Lead and coordinate offshore installation teams and contractor personnel on cable lay vessels, trenching vessels, and support craft.
- →Oversee the safe marine transport of cables and equipment from storage/load-out ports to the offshore site, ensuring compliance with handling procedures and marine warranty requirements.
- →Ensure the T&I contractor executes the works in line with the Installation Procedure, method statements, risk assessments, and project schedule.
- →Proactively secure interfaces to related work packages to de-risk package scope.
- →Monitor marine coordination, DP operations, and vessel performance throughout all offshore operations.
- →Manage interface and sequencing with other offshore scopes (e.g., foundations, offshore substations, array cables).
- →Uphold and enforce HSE standards, including Permit to Work (PTW), toolbox talks, emergency drills, and incident reporting.
- →Drive progress tracking and reporting (daily progress reports, KPI monitoring, HSE reporting) to the onshore execution team.
- →Support offshore readiness reviews, walk-to-work (W2W) planning, weather windows assessments, and marine operations planning.
- →Be accountable for offshore execution risk management and mitigation measures in line with the project risk register.
- Strong leadership, problem-solving, and decision-making skills.
- Excellent communication and stakeholder management abilities.
- Ability to work in offshore environments for extended periods.
- Certification in GWO (Global Wind Organization) training, BOSIET, or equivalent offshore safety training is preferred / desirable.
- Proficiency in project management tools and software.
- Significant experience in offshore wind farm installation, particularly in export cable transport and installation (T&I).
- Proven track record as an Offshore Installation Manager, Cable Package Rep, or similar offshore leadership role.
- Certified for offshore work: BOSIET / GWO, OGUK / ENG1 medical, and relevant STCW or marine safety certifications (desirable).
- Strong technical knowledge of subsea cable handling, vessel operations (DP2/DP3), and marine logistics.
- Familiar with marine warranty surveyor (MWS) requirements, load-out operations, and offshore project documentation.
- Solid understanding of HSE regulations, CDM, LOLER, PUWER, and environmental controls.
- Effective communicator and leader with excellent organizational and coordination skills.
Requirements
~1 min read- Degree in Mechanical, Geotechnical, Civil or Structural Engineering.
Vacancies - come and work with us! - Offshore Wind Farm | Inch Cape Wind
Think you are an ideal candidate? Apply now using the button above
Location & Eligibility
Listing Details
- First seen
- May 7, 2026
- Last seen
- May 8, 2026
Posting Health
- Days active
- 0
- Repost count
- 0
- Trust Level
- 51%
- Scored at
- May 7, 2026
Signal breakdown
Please let inchcapewind know you found this job on Jobera.
2 other jobs at inchcapewind
View all →Explore open roles at inchcapewind.
Browse Similar Jobs
Stay ahead of the market
Get the latest job openings, salary trends, and hiring insights delivered to your inbox every week.
No spam. Unsubscribe at any time.