Water Meter Installer – Sarasota County Utility Project

United StatesUnited States·Sarasota Countymid
OtherInstaller
0 views0 saves0 applied

Quick Summary

Key Responsibilities

Remove and replace residential water meters, primarily 5/8-inch through 1-inch meters. Perform meter/register retrofits, including larger-meter retrofits when assigned.

Requirements Summary

Remove and replace residential water meters, primarily 5/8-inch through 1-inch meters. Perform meter/register retrofits, including larger-meter retrofits when assigned.

Technical Tools
OtherInstaller

We are hiring dependable, motivated Water Meter Installers for a long-term project in Sarasota County, Florida. The project involves upgrading approximately, including the installation of Badger water meters and cellular endpoints, meter/register retrofits, and documentation of the water service lines at each account.

This is a production-based field position suited for someone who enjoys working independently, working outdoors, and being rewarded for productivity. Training will be provided on our installation procedures, documentation requirements, meter boxes, valves, risers, and basic repairs.

Responsibilities

~1 min read

Installers will:

  • →Remove and replace residential water meters, primarily 5/8-inch through 1-inch meters.
  • →Perform meter/register retrofits, including larger-meter retrofits when assigned.
  • →Install and activate Badger cellular endpoints.
  • →Identify and document the city-side and customer-side service line material.
  • →Take clear required photographs before, during, and after each installation.
  • →Record old and new meter numbers, readings, transmitter information, and other required information.
  • →Shut off and restore water service safely.
  • →Flush water lines and inspect installations for leaks.
  • →Verify proper meter installation and flow direction.
  • →Replace meter lids, boxes, risers, and valves when required.
  • →Keep the installation area clean and remove old material and debris.
  • →Complete required handheld records and paperwork accurately.
  • →Return old meters and completed paperwork at the end of the workday.

The project requires detailed documentation of each installation, including photographs of the existing meter setting, service line materials, meter information, flushing, and the completed installation.

After training and the initial two-week learning period, installers are expected to complete a minimum of:

Quality is just as important as production. An account is considered complete only when the required photographs, service-line information, handheld information, and paperwork have been properly submitted.

Location & Eligibility

Where is the job
Sarasota County, United States
On-site at the office
Who can apply
US

Listing Details

Posted
September 12, 2026
First seen
September 26, 2026
Last seen
September 29, 2026

Posting Health

Days active
3
Repost count
0
Trust Level
24%
Scored at
September 29, 2026

Signal breakdown

freshnesssource trustcontent trustemployer trust
Newsletter

Stay ahead of the market

Get the latest job openings, salary trends, and hiring insights delivered to your inbox every week.

A
B
C
D
Join 12,000+ marketers

No spam. Unsubscribe at any time.

Water Meter Installer – Sarasota County Utility Project