Doc Control Specialist - Data Center Construction

United StatesUnited States·LockhartOn-sitemid
OtherConstruction
2 views0 saves0 applied

Quick Summary

Overview

Job Summary Generally responsible for document management for specific projects and is the key resource for the management of documentation and records at the site.

Technical Tools
OtherConstruction

Generally responsible for document management for specific projects and is the key resource for the management of documentation and records at the site. This work will be performed under general supervision.

Responsibilities

~1 min read

1.    Assists with the document preparation for scanning (i.e., removes all staples, paper clips).
2.    Handles document retrieval requests, and assists in document reproduction .
3.    Maintains the master project/drawing / specification files as the repository of design /construction documents.
4.    Maintains transmittal logs and records and ensures compliance.
5.    Organize, prepare and box in-active records for archives, storage, retention and/or destruction.
6.    Responsible for maintenance of the project electronic and physical library records.
7.    Serves as main contact for file maintenance, quality control and retrieval of physical files within the central library.
8.    Supports and maintain the operation of the Electronic Management & Physical File Structure Systems.

Requirements

~2 min read

1.    3-5 years of previous support experience required. Experience with Contract Manager or other contract management tool is preferred.
2.    Familiarization with Prolog, ERP systems and other related project management software preferred.
3.    Must be detailed oriented, have excellent organizational skills and have the ability to multi-task.
4.    Proficiency with Microsoft Office Package; strong understanding of Word, Excel, and Outlook.
5.    Requires a high school diploma, Associate's Degree preferred (or equivalent working knowledge/experience).
6.    Strong interpersonal and communication skills, both written and verbal, and a professional demeanor are required.

Note: Job Description is subject to change at any time and may include other duties as assigned.

1.    May stoop, kneel, or bend, on an occasional basis
2.    Must be able to comply with all safety standards and procedures
3.    Required to use hands to grasp, lift, handle, carry or feel objects on a frequent basis
4.    Will interact with people and technology frequently during a shift/work day
5.    Will lift, push or pull objects pounds on an occasional basis
6.    Will sit, stand or walk short distances for up to the entire duration of a shift/work day.
7.    Will use telephone, computer system, email, and other electronic devices on a frequent basis to communicate with internal and external customers or vendors
 
Safety Level

Safety-Sensitive

Note: Jobs with the Safety-Sensitive designation are those that include tasks or duties that the employer reasonably believes could affect the safety and health of the employee performing the task or others such as operating a vehicle, operating equipment, operating machinery or power tools, repairing/maintaining the operation of any vehicle/equipment, the handling/disposal/transport of hazardous materials, or the handling/treatment/disposal of potentially flammable/combustible materials.

#LI-HW1

Location & Eligibility

Where is the job
Lockhart, United States
On-site at the office
Who can apply
US

Listing Details

Posted
September 4, 2026
First seen
September 4, 2026
Last seen
September 28, 2026

Posting Health

Days active
23
Repost count
0
Trust Level
20%
Scored at
September 28, 2026

Signal breakdown

freshnesssource trustcontent trustemployer trust
Newsletter

Stay ahead of the market

Get the latest job openings, salary trends, and hiring insights delivered to your inbox every week.

A
B
C
D
Join 12,000+ marketers

No spam. Unsubscribe at any time.

Doc Control Specialist - Data Center Construction