SR Supply Planner SDA
Quick Summary
o Production Plan o Opening Stock o incoming orders 2. POs · Place POs for needed material (local and import) 3.
1. Planning
· MPS (Master Production Schedule)
o Get inputs on the plan (Forecast, Opening stock, and Production Achievement)
o Run the inputs to get the final plan numbers.
· RCCP (Rough Cut Capacity Plan)
o Check capacity available to achieve the required plan (number of working days, number of workers, and number of machines)
· MRP (Material Requirement Plan)
o Run MRP to determine the needed material to achieve the production plan
o Inputs of MRP:
o Production Plan
o Opening Stock
o incoming orders
2. POs
· Place POs for needed material (local and import)
3. Actualization Report
· Make actualization report to determine achievement percentage, missed qty, and failure root cause.
4. Follow up
· Follow Up on incoming shipments (Local and Export) with the logistics team and make sure that delivery dates meet the required production plan
· Follow up production plan with production teams to make sure that the plan is achieved daily and solve any sudden issues instantly
· Follow-up updates occurred on BOM with the industrial team and make sure that real consumption meets with recorded consumption on the system
· Follow-up price updates with the sourcing team to be considered in purchase orders.
Bachelor’s degree in engineering
Over 5 years’ Experience
Planning skill
Critical thinking
Communication
Analytical skill
Detail Oriented
Organization
Excellent knowledge of MS Office.
Excellent Knowledge of ERP systems
Location & Eligibility
Listing Details
- First seen
- September 26, 2026
- Last seen
- September 26, 2026
Posting Health
- Days active
- 0
- Repost count
- 0
- Trust Level
- 49%
- Scored at
- September 26, 2026
Signal breakdown
Browse Similar Jobs
Stay ahead of the market
Get the latest job openings, salary trends, and hiring insights delivered to your inbox every week.
No spam. Unsubscribe at any time.