Site Engineer (OHL)
Site EngineerConstruction & Real Estate
0 views0 saves0 applied
Quick Summary
Requirements Summary
Maintain ITPs and records (torque logs, fitting checklists, sag/tension data, OPGW fibre tests); manage NCRs and close‑out. Safety, health & environment: Enforce CDM controls, safe systems of work,
Technical Tools
Site EngineerConstruction & Real Estate
- Planning & coordination: Review IFC drawings, method statements, lift plans, and stringing plans; align with Construction Phase Plan and Temporary Works designs.
- Setting‑out & verification: Check tower locations/stubs, foundations, and orientation; confirm wayleave and profile clearances before erection
- Tower assembly oversight: Supervise steelwork pre‑assembly, bolt grades/torques, crossarm lifts, insulator and hardware installation; verify earthing continuity.
- Stringing & sagging: Set up winches/tensioners and travelers per manufacturer and client requirements; oversee running‑out, tensioning, dead‑ends/joints, spacers; achieve/record sag‑tension to approved ruling spans and temperature windows.
- Quality assurance: Maintain ITPs and records (torque logs, fitting checklists, sag/tension data, OPGW fibre tests); manage NCRs and close‑out.
- Safety, health & environment: Enforce CDM controls, safe systems of work, permits, and exclusion zones; assure LOLER/PUWER compliance for cranes/MEWPs/winches/tensioners; deliver daily briefings and support incident investigations.
- Client procedures & authorisations: Apply National Grid Transmission Procedures (e.g SR106 commissioning, SR135 drawing management) and Safety Rules/NSIs as applicable to the work scope.
- Documentation & reporting: Keep daily records of progress, plant, weather; produce redlines/as‑builts and handover packs; support commissioning panels as required.
- Stakeholder engagement: Interface with Client Engineer/NEC Supervisor, land agents, and environmental teams; host/participate in audits and management tours
- Programme adherence: towers/sections completed to plan; minimal re‑work from QA/NCRs.
- Handover quality: completion packs/records and as‑builts
Requirements
~1 min readCore experience
- 2–5+ years in OHL construction with tower erection and/or stringing exposure on DNO/TSO projects; working knowledge of BS EN 50341 application in construction.
- Hands‑on sag‑tension / stringing charts and field measurements; use of travelers, sheaves, running boards, grips, and tensioners in accordance with standard practice.
- Planning and controlling lifting operations for tower sections/crossarms/plant under LOLER (lift plans, SWLs, inspections, competent persons
- Experience with client procedures (e.g National Grid SR106/SR135), commissioning evidence packs, and drawing/as‑built management.
- Familiarity with apprenticeship routes and transmission/distribution distinctions (e.g Linesperson standards), helpful for mentoring crews and verifying competencies.
Location & Eligibility
Where is the job
London, United Kingdom
On-site at the office
About this job
- Posted
- Today
Listing Details
- Posted
- October 21, 2026
- First seen
- October 21, 2026
- Last seen
- October 21, 2026
Posting Health
- Days active
- 0
- Repost count
- 0
- Trust Level
- 60%
- Scored at
- October 21, 2026
Signal breakdown
freshnesssource trustcontent trustemployer trust
External application
4 other jobs at
View all →Browse Similar Jobs
Architect4.5kProperty Manager1.1kScheduler967Estimator937Construction Manager749Development Manager701Site Supervisor602Facilities Manager533Surveyor532Maintenance Manager505Site Manager431Fit-Out Manager341Quantity Surveyor301Facility Manager254Leasing Manager177Real Estate Agent143Maintenance Coordinator129Asset Manager128Leasing Specialist107Construction Estimator103
Newsletter
Stay ahead of the market
Get the latest job openings, salary trends, and hiring insights delivered to your inbox every week.
A
B
C
D
No spam. Unsubscribe at any time.
