Scheduler (Construction)

United StatesUnited States·Plaistowmid
SchedulerConstruction & Real Estate
1 views0 saves0 applied

Quick Summary

Overview

Methuen Construction is a leading self-performing industrial and heavy civil general contractor with over 65 years of experience.

Technical Tools
SchedulerConstruction & Real Estate

Methuen Construction is a leading self-performing industrial and heavy civil general contractor with over 65 years of experience. We specialize in the construction of water and wastewater treatment facilities, industrial facilities, and other critical infrastructure projects. Serving private, municipal, state, and federal clients across the Northeast, we deliver innovative, well-planned projects that are completed on time and with an uncompromising focus on safety. At Methuen, we foster a culture of teamwork, respect, and a can-do attitude that values every teammate and stakeholder.

The Scheduler collaborates with the Director of Scheduling and project management teams to assist in the development, implementation, and upkeep of the project's comprehensive schedule. This position reports to the Director of Scheduling and is not responsible for the oversight of other teammates. This is a full-time, salaried-exempt position.

Your Role

  • Create and update construction project critical path method schedules
  • Perform all work required to ensure that project schedules are complete and accurate
  • Cost load schedules as required
  • Resource loading schedules as required. Analyze resource loading and recommend schedule adjustments as appropriate
  • Proactively analyze project schedules including comparing cumulative cost/resource curves to actuals, tracking float consumption, change order impact analysis, etc.
  • Prepare time impact analyses
  • Work with the Director of Scheduling to continually improve the Company’s scheduling methodology, best practices, and effectiveness
  • Produce network logic diagrams, bar charts, and schedule reports for all project schedules, as required, to support the project management teams
  • Provide training and technical support for scheduling software
  • Travel to individual projects, as required, to provide scheduling support
  • Participate in the scheduling portion of Project Reviews as required
  • Travel to project sites in order to train and assist with scheduling needs

Your Education and Experience

  • Three or more years’ experience in the field, as a Scheduler, Project Manager, Project Engineer, or other relatable position
  • Experience with Primavera P6
  • Excellent verbal and written communication skills are required
  • The ability to learn or master skills quickly is required
  • A degree in engineering, construction management, or a related field is preferred

What You Bring to the Team

  • Proven ability to excel in a fast-paced environment
  • Excellent written and verbal communication skills
  • Ability to work independently and as part of team
  • Outstanding attention to detail
  • Strong interpersonal (tact, diplomacy, influence, motivation) skills
  • Ability to work with multiple project teams
  • Ability to drive the process and obtain information needed from varying project teams

Work Environment/Physical Demands

  • Ability to lift a minimum of 10-25 lbs.
  • Able to sit for extended periods of time
  • Able to function in a standard office setting

Travel

Travel is primarily limited to Northeast jobsite locations. This position is ONSITE in Plaistow, New Hampshire when not traveling to assigned jobsites.

Benefits

  • Group health & welfare benefits including options for medical, dental and vision
  • Company Benefits: Employee Life Insurance & Accidental Death & Dismemberment (AD&D), Spouse and Dependent Life & AD&D, Short Term Disability (STD), Long Term Disability (LTD), Employee Assistance Program and Health Advocate
  • Voluntary benefits at discounted group rates for accidents, critical illness, and hospital indemnity
  • Flexible Time Off Program (includes vacation and personal time)
  • Paid Sick and Safe Leave
  • Paid Parental Leave Program
  • 10 Paid Holidays
  • 401(k) Plan (company matching contributions up to 4%).
  • Employee Referral Program

Equal Opportunity Employer, including disabled and veterans.

Reasonable accommodations may be made to enable individuals with disabilities to perform the essential functions.

Pay range: $90,000-160,000

Please note that all positions require pre-employment screening, including drug and background check, as a condition of employment.

Why You’ll Love Working Here

Methuen Construction is widely recognized as one of the most successful, self-performing general contractors in the industry. Built on over 65 years of experience, Methuen Construction employs the highest skilled trades professionals and managers. As we expand our construction territory, diversify our client base, and enhance our operational capabilities, our need for highly skilled teammates is growing! We offer top-tier compensation and benefits, in addition to a team oriented, motivated, and respectful company culture.

#LI-HP1

#LI-Onsite

Location & Eligibility

Where is the job
Plaistow, United States
On-site at the office
Who can apply
US

About this job

Who can apply
United States
Posted
27 days ago
Employer
has 30 open jobs on Jobera.

Listing Details

First seen
September 26, 2026
Last seen
October 21, 2026

Posting Health

Days active
27
Repost count
0
Trust Level
20%
Scored at
October 24, 2026

Signal breakdown

freshnesssource trustcontent trustemployer trust

4 other jobs at

View all →

Explore open roles at .

Newsletter

Stay ahead of the market

Get the latest job openings, salary trends, and hiring insights delivered to your inbox every week.

A
B
C
D
Join 12,000+ marketers

No spam. Unsubscribe at any time.

Scheduler (Construction)